xMaster 2.0 review
DownloadA Schedule Manager for the X-10 Model CP290 Computer Interface.
|
|
A Schedule Manager for the X-10 Model CP290 Computer Interface. Use xMaster to create and edit schedules of events that can be stored in the CP290's memory, or saved to disk. Retrieve events from the CP290.
Have different schedules automatically loaded to the CP290 on specific dates. Automatically adjust Event times relative to sunrise / sunset. Other features: set CP290 Clock, set Base House Code and run CP290 Self Test.
Written in C using Apple's Xcode. Requires Mac OS 10.3 or higher (may work with 10.2, but not tested).
Requirements:
Requires xCommander for setup
xMaster 2.0 keywords